
Originally Posted by
Aimless
Think failure to deliver is not the real problem—after all, other manufacturers have done so too without there being nearly as much of a fuss. I suspect they notified the EU and tried to work with the Commission to find ways to address the problems—in accordance with their contracts, if those contracts are even remotely similar to the one with AZN. Had AZN notified the commission in a timely manner, I suspect all of this could have been avoided.